When to buy a pressure washing skid - aluminum frame built to order
Aluminum pressure washing skid frame built by Miller Soft Wash in New Paris, Indiana.

Pressure Washing Skid Guide · Miller Soft Wash

When to Buy a Pressure Washing Skid

The best time to buy a pressure washing skid is the off-season, before your busy months start. In the Midwest that means late fall and winter. You want the frame built, plumbed and in your truck before the phone starts ringing in spring.

I’m Kenneth Miller. I build pressure washing skids to order in New Paris, Indiana, and run my own washing business, so I watch this timing from both sides.

Text for a quoteCall KennethRequest a quote online

Lead Time on a Skid

Every frame I build is made to order. Plan on:

Every frame is built in New Paris, in Elkhart County, and local buyers can arrange pickup. Details for nearby contractors are on our Elkhart, Indiana skid page.

  1. Build: 2 to 3 weeks for the frame
  2. Plumbing: extra time if Miller Power LLC in Topeka sets it up, depending on the setup
  3. Freight: transit time to your state, or a day to pick up in New Paris, Indiana
  4. Your setup: a day or two to install it, test it and load your gear

From order to washing, a bare frame can be in your truck in a few weeks. A fully plumbed skid takes longer.

Why the Off-Season Is the Best Time

  • No lost work: you’re not pulling your truck off jobs to swap rigs.
  • Time to plan: you can think through tanks, reels and layout instead of rushing.
  • Time to test: you can run the rig and fix anything before customers are waiting.

In northern climates, winter is also when trucks sit anyway. That’s the time to build.

Watch Out for the Spring Rush

Washing companies across the country gear up at the same time. Equipment builders and dealers often get busy in spring, and lead times can stretch. Ordering in winter keeps you ahead of that.

When It’s Time to Upgrade

Signs you’ve outgrown your current setup:

  • You’re loading and unloading equipment every day
  • You’re turning down jobs because you can’t run soft wash and pressure washing on the same trip
  • Your water tank runs dry before the job is done
  • Your old frame is rusting or coming apart
  • You bought a new truck and the old skid doesn’t fit

When to Buy in Your State

If you’re close to New Paris, pickup saves freight and time. See pressure washing skids Indiana and pressure washing skids Michigan. Buyers in Ohio, Illinois and Kentucky usually go with freight, so build that transit time into your plan.

A sample off-season timeline

Here’s how an order can line up if you start in the off-season:

  1. Week 1: measure your bed, text your truck details and ZIP code, and decide on plumbing
  2. Weeks 1 to 3: the frame is built
  3. After that: plumbing at Miller Power LLC in Topeka if you want it, then freight or pickup
  4. Before your first job: install it, run water through everything, and load your gear

Real timing depends on the build, the plumbing setup and freight to your area, so ask when you order. If you already own the equipment and plan to plumb it yourself, add a weekend or two for the install. If Miller Power is plumbing it, the skid comes to you ready, and you only need to secure it in the bed and test it.

Built in New Paris, Indiana

Every frame is built in New Paris, in Elkhart County, Indiana, by Kenneth Miller, the owner-operator of Miller Soft Wash, who washes houses and roofs across Northern Indiana off his own skid. His truck runs a 9 GPM pressure washer and a 15 GPM soft wash system with mixing valves and hose reels, so the layout on these frames comes from real working experience. Call or text Kenneth at 574-361-3988 with your truck and bed length, and he will gladly help you pick the right setup.

Skid Timing Questions

How long does it take to build a skid?

Miller Soft Wash frames take 2 to 3 weeks to build. Plumbing and freight add time on top.

When should I order a skid for spring?

In winter, so the frame is built, plumbed and tested before spring work starts.

Can I get a skid in the middle of the season?

Yes. Lead time is still 2 to 3 weeks for the frame. Plan the swap for a rain day or a slow week.

How do I start an order?

Text your truck year, make, model, bed length and ZIP code to 574-361-3988.

Is winter a good time to plumb a skid?

Yes. You have time to think through the setup, and the rig is ready and tested before spring work starts.

How long does freight take?

It depends on where it’s going. Ask for transit time when you get your freight quote, and plan the build time of 2 to 3 weeks on top.

Should I wait for a sale?

The frames are priced at $3,500 for 5′5″, 6′ and 6′5″ beds and $3,600 for 8′. Waiting mostly costs you working time, so order when you’re ready to set it up.

Pressure washing skid pages

Text for a quoteCall Kenneth

Get a Fast Quote