Pressure Washing Skid Guide · Miller Soft Wash
Bare Skid Frame vs Turnkey Pressure Washing Skid
A bare skid frame is just the frame. You choose and mount your own pumps, tanks and reels. A turnkey pressure washing skid shows up with everything mounted and plumbed. Turnkey is faster to start. A bare frame costs less up front and lets you build exactly the rig you want.
I’m Kenneth Miller. I build bare aluminum pressure washing skid frames in New Paris, Indiana, and offer plumbing through Miller Power LLC for buyers who want both.
What You Get With Each
Bare skid frame: the base, uprights, shelves and usually a ladder rack. Mine add open space between the shelves for tanks and bolted connections at the uprights. No pump, engine, tanks, reels or hose.
Every frame is built in New Paris, in Elkhart County, and local buyers can arrange pickup. Details for nearby contractors are on pressure washing skids in Elkhart.
Turnkey skid: a frame with the pressure washer, soft wash pump, tanks, reels, hose and plumbing already installed. You strap it in and go to work.
Cost Difference
Bare aluminum frames listed online in November 2026 ran about $3,600 to $6,000. Mine are $3,500 for 5′5″, 6′ and 6′5″ beds and $3,600 for 8′. Turnkey skids in the same listings ran from a few thousand dollars for small 12-volt soft wash units to $30,000 or more for full dual systems. Shipping a loaded skid usually costs more than shipping a bare frame because it weighs more. How much a pressure washing skid costs breaks it down.
Control Over Your Equipment
With a bare frame you pick:
- The pressure washer brand, GPM and engine
- The soft wash pump and how big it is
- Tank sizes to fit your truck’s payload
- How many reels, and where they go
- Mixing valves or a proportioner
With a turnkey skid, someone else made those calls. That’s fine if their choices match how you work. If you already own a good pressure washer or tanks, a bare frame lets you keep them.
Time to Get Working
Turnkey is the fastest way to start if the seller has one ready. A bare frame takes more planning, and either you or a shop has to plumb it. My frames take 2 to 3 weeks to build. Plumbing adds time on top, depending on the setup.
The Middle Path: Bare Frame, Plumbed Your Way
You don’t have to do it all yourself. Tell us the setup you need, I build the frame, then I take it to Miller Power LLC in Topeka, Indiana, and they plumb it any way you want. My own truck runs a 9 GPM pressure washer and a 15 GPM soft wash system with mixing valves and hose reels that Miller Power plumbed. You get a rig built your way without doing the plumbing. How to set up and plumb a soft wash skid helps you decide what to ask for.
Choosing Between a Bare Frame and a Turnkey Skid
- Buy a bare frame if you already own equipment, want to choose every part, or want to spend less up front.
- Buy turnkey if you need to start next week and the seller’s setup fits how you wash.
- Buy a bare frame plumbed by Miller Power if you want your own setup without the work.
What to have ready when you order a bare frame
Know your truck’s year, make, model and inside bed length, and have a list of the equipment you already own. If you want it plumbed, write down the pumps, tank sizes and number of reels you want, and Miller Power can work from that.
Built in New Paris, Indiana
Every frame is built in New Paris, in Elkhart County, Indiana, by Kenneth Miller, the owner-operator of Miller Soft Wash, who washes houses and roofs across Northern Indiana off his own skid. His truck runs a 9 GPM pressure washer and a 15 GPM soft wash system with mixing valves and hose reels, so the layout on these frames comes from real working experience. Call or text Kenneth at 574-361-3988 with your truck and bed length, and he will gladly help you pick the right setup.
Bare vs Turnkey Questions
It is if you own equipment already or want to pick each part. You pay for the frame and add only what you need.
Often, yes, if it fits the layout. Send me photos and measurements and I’ll tell you what I think.
You can do it yourself, or Miller Power LLC in Topeka, Indiana will plumb it any way you want.
Usually. Pumps, tanks and reels add weight, and freight is priced partly on weight.
Miller Soft Wash frames take 2 to 3 weeks to build. Plumbing adds time, depending on the setup.
Pressure washing skid pages